The key to a successful turnaround and shutdown is thorough planning. It’s important to let everyone know in advance if any equipment needs to be fixed, replaced, or maintained.
A base investigation of a treatment facility will give an outline of the degree and term of any closures and turnarounds required. Even though changes can still be made at the last minute, most of them can be made safely with careful planning.